SOLUTIONS

Configure matching solutions by component scenario

Different components require vastly different accessory specifications: some prioritize protection and positioning, others focus on shock absorption and sound dampening, while others demand production line compatibility. Start by defining the use case, then select the appropriate materials and structure.

PVC-NBR Rubber Foam Pipe Insulation for Piping
01SCENARIO

Piping and Underbody Protection

Scenario Challenge

The engine bay and undercarriage tubing are constantly exposed to fluids, high heat, and vibration. Choosing the wrong sleeve can lead to hardening, cracking, and noise after assembly.

Suggest Artifact Direction

  • Select the inner and outer diameters and wall thickness of the foam pipe based on pipe diameter and routing; reserve springback allowance at bends.
  • High-temperature or heat-isolation pipe sections shall be wrapped with rubber-plastic insulation pipes, cut to size based on pipe diameter for supply.
  • End flange engages with a liner or sleeve to minimize scraping and edge trimming during assembly.
Compatible with linksRubber & Plastic Insulation Pipe · Foam Sheath · Flanged Pipe
Extruded sleeves for harnesses and tubing
02SCENARIO

Automotive Electronics & Wiring Harnesses

Scenario Challenge

High part variety and complex routing in harnesses make differences in protective covers and labels critical for picking efficiency and traceability accuracy on the production line.

Suggest Artifact Direction

  • Star-shaped tubes isolate multiple wire harnesses in separate chambers, reducing friction and crosstalk.
  • Jacket opening direction and wall thickness designed based on fixed points and bend radius.
  • Print thermal labels with each unit; sync model, batch, and process information for immediate attachment.
Compatible with linksStar tube · Wire harness sleeve · Thermal label paper
Felt adhesive for NVH control
03SCENARIO

Exterior and Interior Trim, NVH

Scenario Challenge

Tight gaps in interior trim often lead to squeaks and rattles, which typically originate from hidden shims, material density, or adhesive layer selection.

Suggest Artifact Direction

  • Die-cut felt and foam components for interior curved surfaces, controlling thickness tolerance and compression rebound.
  • Select the adhesive solution based on the bonding substrate to prevent adhesive failure or residue in high-temperature environments.
  • Consolidate multiple gaskets from the same production line to reduce part retrieval and prevent incorrect assembly.
Compatible with links背胶毛毡 · 海绵模切
汽车充电口解锁拉带
04SCENARIO

座椅与开闭件

Scenario Challenge

按摩气泵、调节拉带与解锁拉带都集中在座椅骨架附近,固定点、行程与噪声要求各不相同。

Suggest Artifact Direction

  • 气泵袋按气泵外形与骨架固定点设孔,包覆后减小工作噪声与振动传递
  • 座椅调节拉带与充电口解锁拉带按行程、拉力与手感定制长度与宽度
  • 骨架与饰板之间用毛毡或海绵垫片填充间隙,减少异响
Compatible with links气泵袋 · 解锁拉带 · 毛毡垫片
吸塑托盘分隔摆放零部件
05SCENARIO

包装周转与标识

Scenario Challenge

多品种小批量生产时,零件在周转、上线与仓储环节容易混料、磕碰,标识也要随批次更新。

Suggest Artifact Direction

  • 吸塑托盘按零件轮廓开腔,分隔摆放并控制堆叠层数
  • 内衬管与护套保护管口与配合面,减少周转中的刮擦
  • 铜版纸与热敏标签按型号、批次随件标识,便于扫码与追溯
Compatible with links吸塑托盘 · 内衬管 · 标签纸

PROCESS DETAILS

End-to-end collaboration from drawing review to mass production supply

Each stage includes deliverables and items requiring customer confirmation. Milestones align with APQP phases under the IATF 16949 system, ensuring traceable confirmation records.

01

Drawing Review

Deliverables:Feasibility Opinion on Process

Verify component dimensions, mounting location, operating environment, and assembly method to determine the available range of materials and processes.

Customer cooperationProvide part drawings, installation locations, and estimated quantities.

02

Tooling and prototyping

Deliverables:Sample and Dimension Report

Manufacture extrusion dies, die-cutting tooling, or bag cutting molds per the confirmed plan. After sample production, verify dimensions, fit, and appearance; adjust as necessary.

Customer cooperationConfirm material, cross-section, or bag type against the dimension direction

03

First Article Inspection

Deliverables:Sample and Confirmation Form

Sample approval is granted after assembly validation, locking material grades, tolerances, and process parameters as the baseline for mass production comparison.

Customer cooperationSign off after assembly verification to confirm tolerances and appearance.

04

Batch production

Deliverables:Batch Records and Sampling Reports

Schedule by line cycle time; inspect dimensions and appearance via batch sampling during extrusion and assembly. Isolate anomalies first, then determine if they stem from equipment or material variations.

Customer cooperationConfirm first article and schedule; define phased delivery milestones.

05

Delivery & Change Management

Deliverables:Delivery Checklist and Change Log

Deliver in scheduled batches and record batch details. Update drawings and mold archives simultaneously when changes occur to maintain traceability.

Customer cooperationReceive by batch and report change requirements

CONTACT

Let's first confirm the installation location and quantity before discussing the solution.

Scenario solutions are starting points, not templates. Share your component drawings and operating environment with us to receive tailored product recommendations for your specific application.

  • Installation Location and Operating Environment
  • Part Dimensions and Weight
  • Performance and Appearance Requirements
  • Project Milestones and Delivery Dates
Phone Consultation13777088810Dial →

No. 8, Sanlian Road, Gaoqiao Town, Haishu District, Ningbo City, Zhejiang Province

Monday–Friday 09:00–18:00

View full contact details
浙ICP备2026103966号-1